online testing of safety valves

Starting from 6 October 2014 we have expanded our scope of business to include online testing of safety valves. All safety valves need to be regularly tested to ensure proper operation. Spring-loaded safety valves can be equipped with a pneumatic, hydraulic, or electropneumatic auxiliary control. Safety valves with auxiliary control must also undergo a function […]

Expanding the business premises

Expanding the business premises. aas GmbH is delighted with the new team. In September 2015, we opened our sales office Mitte, Kahl am Main. In addition, the surveillance audit (DIN ISO 9001, SCC**, DIN ISO 14001, OHSAS 18001) was carried out in our facility by PÜG, an accredited certification body. We are delighted that we […]

Framework agreement

We are pleased that in October 2015, we were able to conclude an additional framework agreement for valve repairs.

surveillance audit (WHG, Federal Water Act)

In November, the surveillance audit (WHG, Federal Water Act) was carried out in our facility. We are delighted that we were re-certified with no reservations. Certificate available under Download.

Expansion of the online testing system

Expansion of the online testing system For testing additionally stressed safety valves and their control units; tests can be performed on all control systems, such as Series 700, PC 50-53, STE 4, and STE 5.

The surveillance audit DIN ISO 9001, SCC**, DIN ISO 14001

The surveillance audit (DIN ISO 9001, SCC **, DIN ISO 14001) was carried out by PÜG in our company. We are pleased that we have been recertified without any complaints. We also concluded an additional framework agreement for online safety valve testing.

.

. . . . . . . . .

As a “new” German valve manufacturer

aas GmbH at DIAM 2019 in Bochum As a “new” German valve manufacturer from Wesel with longstanding expertise, aas GmbH will present its extensive product portfolio featuring standard and special valves for power stations and industrial applications at this year’s trade fair for industrial valves (DIAM) in Bochum (9 and 10 October). aas GmbH will […]

Current status of the new building

The construction of our new company headquarters is moving forward. The new office building and production hall are scheduled for completion in March 2020. We’ll keep you posted. Voriger Nächster

Startseite-Armaturenservice2
Your way to us

You can reach us easily by phone or email Monday to Friday from 8:00 a.m. to 6:00 p.m.

WordPress Cookie Plugin by Real Cookie Banner