Current status of the new building

The construction of our new company headquarters is moving forward. The new office building and production hall are scheduled for completion in March 2020. We’ll keep you posted.

Previous slide
Next slide

More news

Feed water control valve

Body design in straight-through form DN100 / PN16 Material: P250GH Calculation pressure: 16 bar Calculation temperature: 200°C 2 pieces

Wedge Gate Valve

Type AKS-125-125-118-AR6 DN125 Design pressure: 131,5 / 141 / 128 bar Design temperature: 530 / 530 / 550°C 12 pieces
All results were loaded
No further results
Startseite-Armaturenservice2
Your way to us

You can reach us easily by phone or email Monday to Friday from 8:00 a.m. to 6:00 p.m.

WordPress Cookie Plugin by Real Cookie Banner