Current status of the new building

The construction of our new company headquarters is moving forward. The new office building and production hall are scheduled for completion in March 2020. We’ll keep you posted.

Previous slide
Next slide

More news

Drain Control Valve

Type AWRV-250-250 Pipe Size Inlet: DN250 End Connection: Buttwelded Material 1.6368 (15NiCuMoNb45) Outlet: DN250 End Connection: Buttwelded Material 1.5415 (16Mo3) Dimensions of pipe connection: Inlet:…

Gate valves

Type AKS-150-150-140-PN160 DN 150 / PN 160 / 1.7335 Nominal pressure: PN 160 Nominal size: DN 150 Body material: 13CrMo44 (1.7335) Seat diameter: 140 mm…
All results were loaded
No further results
Startseite-Armaturenservice2
Your way to us

You can reach us easily by phone or email Monday to Friday from 8:00 a.m. to 6:00 p.m.

WordPress Cookie Plugin by Real Cookie Banner