HP steam reduction station in straight-through design with injection water control valve

Type ADUV-400-700-215
According to data sheet 9.7035.20.163.02
Nominal size: 400/700
Overall length: 1700 mm

Material
Inlet: P250GH (1.0460)
Outlet: P250GH (1.0460)
Injection: P250GH (1.0460)
Inlet: Flange DN400 / PN 10 Outlet: Flange DN700 / PN 10

Stroke: 90 mm
Characteristic: Linear / mod.
KV max at 100% stroke: 1070.00 m ³/h

Flow rate: 37.9 t/h
Inlet pressure: 3.5 bar g
Inlet temperature: 135 °C
Outlet pressure: 0.2 bar ü
Outlet temperature: 70 °C KV value: 972 m ³/h
Injection water pressure: 8 bar ü
Injection water temperature: 70 °C
Injection water volume: 0.4 kg/s

Inlet calculation pressure: 25 bar / outlet: 8 bar
Calculation temperature inlet: 200 °C / outlet: 200°C T
est pressures for pressure test: Inlet 37.5 bar / Outlet: 37.5 bar
Differential pressure for actuator sizing: 10 bar

Pneumatic actuator Type: 2116-1200-100-0,8-2,2-FS -spring closes -air opens
Attachment: Positioner ABB EDP 300 4-20mA
Air filter Riegler VFR 23M 1* 0-10bar
Pipework 8*1mm Cu cutting ring
Painting actuator standard RAL2000

Sound pressure level: <70 dB(A)

Injection water control valve
DN 32 / PN 40
acc. to data sheet 9.7035.20.163.02 in angle form
Leg length: 115 mm / 115 mm

Injection body P250GH (1.0460)
Connection flange DN 32 / PN 40
Injection water pressure: 8 bar g
Injection water temperature: 70 °C
Injection water volume: 0.4 kg/s
Pneumatic actuator Type: 2109-295-20-0,8-2,2-FS -spring closes -air opens

Attachment: Positioner ABB EDP 300 4-20mA Air filter
Riegler VFR 23M 1* 0-10bar
Pipework 8*1mm Cu cutting ring
Painting actuator standard RAL2000

More news

Innovation enters series production!

Body overpressure protection type AGBS / DN 15 “All-in-One”. Equipment part with safety function according to data sheet 0.4021.2707.01 Shut-off valve with additional ball through…

A full dozen!

2 pieces high pressure wedge gate valve type AKS-50-50-44-AR6 DN50 / PN320 Design data: TS 300° C/ PS 320 bar Material: 16Mo3 (1.5415) 10 pieces…
All results were loaded
No further results
Startseite-Armaturenservice2
Your way to us

You can reach us easily by phone or email Monday to Friday from 8:00 a.m. to 6:00 p.m.

WordPress Cookie Plugin by Real Cookie Banner