At our headquarter in Wesel, around 250 solar modules were installed on the roof of the administration building and the production hall this week. In the future, our electric cars can also be charged directly on the company site at two wallboxes. With an output of approx. 116 kWp, we are making a small contribution towards climate neutrality
Customer satisfaction pays off:
Re-order of a high-pressure swing check valve with minimum flow branch, last ordered in 2021 DN200 / PN500 Material: 1.5415 / 1.6368 (16Mp3/15NiCuMoNb5)