At our headquarter in Wesel, around 250 solar modules were installed on the roof of the administration building and the production hall this week. In the future, our electric cars can also be charged directly on the company site at two wallboxes. With an output of approx. 116 kWp, we are making a small contribution towards climate neutrality
1st major order for ARED-V
Thanks to ARED-V – our patented and worldwide first high pressure shut-off, drainage and control valve that is wear-free and without pressure loss (material 1.4903)…