At our headquarter in Wesel, around 250 solar modules were installed on the roof of the administration building and the production hall this week. In the future, our electric cars can also be charged directly on the company site at two wallboxes. With an output of approx. 116 kWp, we are making a small contribution towards climate neutrality
HP steam reduction station in straight-through design with injection water control valve
Type ADUV-400-700-215 According to data sheet 9.7035.20.163.02 Nominal size: 400/700 Overall length: 1700 mm Material Inlet: P250GH (1.0460) Outlet: P250GH (1.0460) Injection: P250GH (1.0460) Inlet:…