Investment in a climate-friendly future

At our headquarter in Wesel, around 250 solar modules were installed on the roof of the administration building and the production hall this week. In the future, our electric cars can also be charged directly on the company site at two wallboxes. With an output of approx. 116 kWp, we are making a small contribution towards climate neutrality

More news

Steam control valve for the far north

Valve type: ADRV-250-250-150-PN160 Pipe Size Inlet: DN250 End Connection: Buttwelded Dimensions of pipe connection: Ø271 * 16mm Material 1.7335 (13CrMo45) Outlet: DN250 End Connection: Buttwelded…
All results were loaded
No further results
Startseite-Armaturenservice2
Your way to us

You can reach us easily by phone or email Monday to Friday from 8:00 a.m. to 6:00 p.m.

WordPress Cookie Plugin by Real Cookie Banner