New Headquarters Construction Progress

CEO, Volker Wurzer and the aas GmbH team are looking forward to the completion of the new headquarters.

Shell construction is scheduled to be finished in October, 2019.
Completion is expected in March, 2020.

 

More news

Reducing station R5 10-6bar track

Type ADUV-250-250-150 Straight-through body design Body Material GP240GH (1.0619) Flange design Water connection Material P250GH (1.0460) Design parameters 25 bar / 250 °C Seat: Ø…
All results were loaded
No further results
Startseite-Armaturenservice2
Your way to us

You can reach us easily by phone or email Monday to Friday from 8:00 a.m. to 6:00 p.m.

WordPress Cookie Plugin by Real Cookie Banner