surveillance audit (WHG, Federal Water Act)

On 25 November, the surveillance audit (WHG, Federal Water Act) was carried out in our facility by R+D. We are delighted that we were certified with no reservations. Certificate available under Download.

More news

Preheating protection for Finland

Preheater Protection Inlet Valve 3-Way Valve Type APPIV-300-300-300-PN250 Dimensions of pipe connection: Inlet / outlet: 323,9 x 16 mm and bypass Bypass: 273,0 x 16…

Injection cooler

Type AEK-300-80-PN100 existing pipe connection dimension steam pipe: Inlet Ø 323.9 * 7.1 mm Outlet Ø 323.9 * 7.1 mm Water pipe connection Flange DN50…
All results were loaded
No further results
Startseite-Armaturenservice2
Your way to us

You can reach us easily by phone or email Monday to Friday from 8:00 a.m. to 6:00 p.m.

WordPress Cookie Plugin by Real Cookie Banner