In November, the surveillance audit (WHG, Federal Water Act) was carried out in our facility. We are delighted that we were re-certified with no reservations. Certificate available under Download.
Valve production
Reducing station DN 50/150 Material 1.7380 Reducing station with injection DN 25/PN 16 Material 1.5415 Voriger Nächster